Welcome to Chembond Products
Supplying fibres for all cement, mortar, screed and concrete

Tel / Fax: 01773 742233

Screed Fibres - Mixing Instructions

For one barrow mix, just add to your cement mixer: 75-80kg of ballast, 1/2 to 3/4 bag of cement and 1 mini bag of fibres. This allows you a cement content of between 250kg-400kg per cubic metre.

If your cement mixer can hold 160kg of ballast, there are sufficient fibres in this bag to produce 1 cubic metre of screed.

Screed Formulation:
2 aggregate, 1 washed sand, 1/2 to 3/4 of a 25kg bag of cement. Maximum size of aggregate 5mm. (Some screed formulation may not require any aggregate).

NOTE 1.8 tonnes of ballast = 1 cubic metre.

This bag is sufficient for 1/2 a cubic metre using a Belle 90 litre 1/2 bag mixer, the bag is also sufficient for 1 cubic metre using a large cement mixer.